Construction terms, defined plainly
The words that decide how a job gets billed and paid. Where the Canadian meaning differs from the American one — holdback against retainage, deficiency list against punch list — each entry says so.
Holdback
Also: Construction holdback · Lien holdback · Retainage (US)
A holdback is a portion of each progress payment that an owner is required to retain for a set period, protecting against liens from unpaid subcontractors and suppliers.
Progress billing
Also: Progress claim · Progress draw · Partial billing
Progress billing is invoicing for the portion of a contract completed so far, rather than issuing one invoice when the job ends.
Construction draw
Also: Bank draw · Draw request · Construction loan draw
A construction draw is a scheduled release of funds from a construction loan, paid after the lender verifies that the corresponding stage of work is complete.
Schedule of values
Also: SOV · SOV in construction
A schedule of values breaks the total contract price into line items with a dollar value each, so progress can be billed against the parts of the work actually completed.
Substantial performance
Also: Substantial completion · Substantial performance of the contract
Substantial performance is the point at which a project is sufficiently complete to be used for its intended purpose, even though minor work or deficiencies remain.
Deficiency list
Also: Punch list (US) · Snag list (UK) · Deficiency report
A deficiency list records the outstanding or defective items identified near the end of a project that must be corrected before the work is accepted as complete.
Change order
Also: Variation · Contract change · CO
A change order is a written, agreed amendment to the contract scope, price or schedule, signed before the changed work is carried out.
Construction contingency
Also: Contingency allowance · Contingency budget
A construction contingency is a sum set aside in the budget for costs that are expected to arise but cannot be identified in advance.
Pay application
Also: Pay app · Application for payment · Progress claim (Canada)
A pay application is the formal request a contractor submits to be paid for work completed in a billing period, supported by documentation the owner or lender verifies before releasing funds.
RFI
Also: Request for information · RFIs in construction
An RFI, or request for information, is a formal written question from the contractor to the design team asking for clarification the drawings or specifications do not provide.
QA/QC
Also: Quality assurance and quality control · QA vs QC
Quality assurance is the process designed to prevent defects; quality control is the inspection that catches the ones that happen anyway.
Shop drawings
Also: Fabrication drawings · Submittal drawings
Shop drawings are detailed fabrication and installation drawings produced by a contractor, supplier or fabricator, showing exactly how a specified element will be made and installed.
Lien waiver
Also: Waiver of lien · Statutory declaration (Canada)
A lien waiver is a signed document in which a contractor, subcontractor or supplier gives up the right to place a lien on a property for work or materials already paid for.